University of Waterloo โ Innovation Arena
- Client
- University of Waterloo
- Facility
- Innovation Arena, 90,000 sq ft institutional facility
- Location
- Waterloo, ON
- Year
- 2024
- Delivery
- General contractor: Melloul-Blamey Construction
Surfaces in scope
Exposed steel deck, structural beams, HVAC ductwork and sprinkler systems; concrete block and drywall walls; hollow metal doors, frames and railings; exposed basement concrete.
Coating systems
Spray-applied dry-fall coatings to all exposed overhead structure and mechanical services; specialized pre-catalyzed waterborne epoxy on wall surfaces; rust-inhibitive direct-to-metal primer and industrial DTM topcoats on hollow metal and railings.
Outcome
All 90,000 sq ft delivered within the construction schedule and turned over with the deficiency list closed out at first inspection. Product data, colour formulas and batch records handed to facilities for future maintenance.